Roger Gough
Showing posts with label River Darent. Show all posts
Showing posts with label River Darent. Show all posts

Wednesday, 15 February 2017

Drainage works for Eynsford 'lake'

Anyone in or passing through the centre of Eynsford recently will have seen the works (pictured) taking place near Gibson's Place. These are being carried out by Kent Highways and are designed to address the long-standing flooding there, about which I have posted before. The flooding problems have generated a mini (or not so mini-) lake whenever there is significant rainfall, creating significant problems for residents, the butcher's opposite, parents taking children to the school and others.

The current works in the carriageway should be complete by the end of the week, with the next phase starting next Monday (20 February). A new pipe, running from the current area of flooding, will be installed along with a large catch pit. The final section of piping (some 6 metres) that connects the drainage system under Gibson's Place to the river will be upgraded, with a flap over the end of the pipe run to prevent water running back up the drainage system when the river levels are high.

Barring weather or other setbacks, the works should be completed by the following weekend (around 25 February). Then we will wait to see if - as will hopefully be the case - this long-standing problem has been tackled.

Wednesday, 30 October 2013

Take part in the Darent River survey

As its name implies, my Darent Valley Division includes much of the course of the River Darent and many of the villages that sit on it: Shoreham, Eynsford, Farningham, Horton Kirby and South Darenth. The river's future is important to us all. Many people remember how the river was severely diminished around the turn of the millennium, and at a meeting of the Lullingstone Liaison Group (which I chair) in early 2012 many of us were concerned about a possible repetition after two dry winters - but then the heavens opened.

The North West Kent Countryside Partnership are undertaking a survey (link below) to help shape the Catchment Improvement Plan and develop projects and priorities for improving the river. It is important to get a wide cross section of responses to ensure that the Catchment Improvement Plan reflects the views of everyone who cares about the river and the valley.

The survey can be found at: