 Some updates on road closures in the village. 

Tomorrow (Friday 8 March) there will be the long-delayed closure of Gildenhill Road for Kent Highways to carry out carriageway repairs. The closure will be between 9:30 and 2:30 and will be between Church Road and Clement Street.

There are still some works due to be carried out on Highlands Hill too but they have again been put back because of other works going on. 

A little further out, Highlands Hill will be closed (10-11 April) for Thames Water works on a fire hydrant. This will be a full road closure (apparently the works will be in the middle of the road) and will be continuous (in other words, including overnight). It is, however, during the half term period and is scheduled for that purpose to avoid disruption to the school. 

There will be a separate closure by KCC on Highlands Hill (to replace a street lighting column) on 30 April, but that will only be between 9:30 and 2:30so once more, this will avoid having an impact on school drop-off and pick up. 

More immediately, the works at the bottom of Highlands Hill (a company called Triconnex providing electricity and gas connections to the development on the old nursery site) are going from two way to four way lights as the works have reached the junction with Swanley Lane. (This took place either yesterday or today). The four way lights, which are manually controlled from 7am to 7pm to ease congestion, will be on for a relatively short time as they become two-way again as they move up the road towards Hextable. All the works should be completed by 22 March. 