A further update on the Pilgrims Way closure. SGN staff worked to identify the gas leak yesterday evening, and then were due to finish the repair this morning, followed by backfilling the area of excavation. Reinstatement of the road surface will take place tomorrow morning (Saturday 30th) and, allowing some time for the reinstatement to settle, the road should be open by the end of the day. The permit to SGN has been amended accordingly with an end date of 30 September. Hopefully that should be the end of this significant disruption to residents.
Welcome to my website. I am proud to represent Sevenoaks North and Darent Valley, one of the loveliest parts of Kent, on the County Council. The Division is made up of a number of communities: Crockenhill, Eynsford (including Lullingstone), Farningham, Horton Kirby, Kemsing, Otford, Seal, Seal Chart, Shoreham, South Darenth, Southdowns, Swanley Village, Underriver and Well Hill. Since October 2019, I have served as the Leader of Kent County Council. This blog reflects both roles.
Friday, 29 September 2023
Thursday, 28 September 2023
Another closure: SGN on Pilgrims Way
A quick note/ update on the closure in Pilgrims Way.
This is an emergency closure by the utility (SGN) to address a gas escape. This is different from a scheduled closure: in these cases the utility (statutory undertaker) does not arrange the timing with KCC and has to inform us only within two hours of starting the closure.
I contacted the relevant KCC officer, who asked SGN to work extended hours to reduce the duration of the road closure (booked as up to 8 days, but this is a maximum). The KCC area inspector attended this morning but by mid-afternoon SGN had not located the leak and so their investigation work was continuing.
KCC have made clear the importance of these works being completed as soon as possible, and I should have an update tomorrow.
Tudor Drive works postponed
More detail to follow later, but the works on Tudor Drive (and associated road closure), scheduled to start tomorrow, are postponed. This is because work by the crew on another scheme has overrun. I will add more later when I have it but I thought important to get this out as quickly as possible.
Wednesday, 27 September 2023
Tudor Drive road works
Residents of Tudor Drive (and Tudor Crescent) were concerned by the initial notice of a road closure of up to 5 days for Kent Highways to carry out pothole blitz/ carriageway patching works, in particular in relation to access. I have taken this up, and understand that a letter has been delivered to residents that hopefully addresses some of these concerns.
To summarise, the aim is now to have the works completed within three working days. On those days (Friday 29 September, Monday 2 October and Tuesday 3 October) the road will be closed for its full length between 0900 and 1700. The road should be open and accessible outside these hours and over the weekend. Officers have emphasised that every effort will be made to maintain access for residents, but that this may be difficult at times when (for example) hot material is being laid. Emergency vehicles are of course exempted from this. Officers have also emphasised that usually a situation can be worked round if residents speak to the gangs, and hopefully this can be accommodated practically while these much desired works take place.
I have also followed up queries as to whether it would be possible to focus first on the area before the junction with Tudor Crescent, leaving that open once the works there are done. However, the large-scale patching that is being undertaken is (I am told) best and most efficiently done across the entire road. The advice I have from the highways engineers is that the quickest way to do the work is to plane out all of the patches first, which can normally can be completed in a matter of around 2-3 hours. The patching then starts shortly afterwards and will be completed using a paving machine usually reserved for resurfacing works. This approach – using quite large machinery and aiming to move as quickly as possible - means that it is not possible to do all of the patches at the top end and then move on to the bottom end of the road.
However, the aim is to get the works done as quickly as possible, hopefully well ahead of the 3 days indicated. Officers are also very aware of the need to secure maximum access and flexibility for Tudor Drive/ Tudor Crescent residents and our Highways Steward will be on site on Friday morning.
Monday, 25 September 2023
PWE: contact point for claims
With apologies for the delay (I had to double check something this morning), anyone wishing to make a claim relating to damage from the initial installation of the raised tables in Pilgrims Way East should send it to this email address:
activetravel@kent.gov.uk
In some earlier responses, I was working from advice that the claim should be sent to Amey; hopefully using this KCC address is a lot easier and more straightforward for any residents wishing to make a claim.
Monday, 18 September 2023
Addressing defects on PWE works
As many residents will know, works over the weekend on the Row Dow junction table top were defective with a severe gap at the top of the ramp. There was therefore a site meeting this morning between KCC and the contractor and subcontractor. There was an action for temporary tarmac to be installed in the afternoon to make it safe until the top of the ramp could be surfaced, although this was not apparent to me when I drove through it in the early evening. With a further closure organised, surfacing was due to take place tonight, and the road is now closed.
Hopefully- though experience makes us all cautious on this - the work should be carried out and the road reopened before the morning. The works on the Tudor Drive junction table top should be carried out this weekend as previously advised.
It shouldn’t be like this, and from KCC’s side, I can only apologise. We will of course be going through this with the contractors to establish what has gone so badly wrong. I also took up with officers earlier today the best route for residents who wish to make a complaint or have a claim in relation to damage to a car. This is being worked through and I will confirm when I have the full details.
My apologies too that this report comes late in the day; I was in long meetings with very poor Wi-Fi through much of today.
Thursday, 14 September 2023
Weekend works in Pilgrims Way East
Following on from yesterday’s post about Pilgrims Way East, permits to close the road have been raised and granted. This is for remedial works to ensure that the tables are now installed to KCC’s specification. This will involve two weekend road closures:
Saturday 16 - Sunday 17 September (ie the coming weekend) - closure between Tudor Drive and Row Dow - for the table near the junction with Row Dow to be treated
Saturday 23 - Sunday 24 September- closure between Shoreham Road and Tudor Drive - for the table near the junction with Tudor Drive to be treated