In my earlier report on action to tackle flooding at Eynsford Road, I expressed the hope that work could be carried out to replace the manhole cover in South Hall Road before Christmas. In practice this was delayed because Kent Highways' contractors had to focus their work pre-Christmas on gritting as temperatures fell.
In the last few days, however, I have been told that the works in South Hall Close have been carried out - as a result, the CCTV survey should be carried out in the near future.
No comments:
Post a Comment