Roger Gough

Monday 20 May 2013

Well Hill road works

There have for some time been problems in Well Hill (the road) in the dip in the road between the junctions with Firmingers Road and Parkgate Road. The flooding issues in this patch of road were raised during a site visit last year and subsequently large potholes have emerged.

As I mentioned at the recent AGM of the Well Hill Residents' Association, Kent Highways were looking to take advantage of a road closure required by water supply works. This was originally scheduled for 24 May but the water company's programme of works was brought forward to today (20 May). Kent Highways have ensured that the road works have been brought forward to take advantage of this revised schedule. Hopefully this should result in the resolution of persistent road problems.

No comments:

Post a Comment